A home office corner at dawn with a closed laptop on a wooden desk, a router with small green lights on a shelf and a suburban street through the window

PLACES · 04 · 6 MIN

Confirm 100/20 Mbps at the exact address before you move

The FCC kept 100/20 Mbps as its benchmark in August 2026. Check the address on its map, then the plan's label, which shows typical speed and monthly price.

100/20 MbpsFCC benchmark
95.5%Summit wireline coverage
67.0%Chaffee wireline coverage
Reviewed

Search the exact address on the FCC's National Broadband Map, count only the providers that list at least 100 Mbps down and 20 Mbps up at that location, and read the plan's broadband label before you sign. The FCC kept 100/20 Mbps as its fixed broadband benchmark in its 2026 Section 706 Report, adopted August 13, 2026. The county can mislead: the same report finds 100/20 wireline service available to 95.5 percent of people in Summit County, Colorado, and 67.0 percent in Chaffee County, Colorado, as of June 30, 2025.

The FCC kept 100/20 Mbps and dropped its gigabit goal

The FCC raised its fixed benchmark from 25/3 Mbps to 100/20 Mbps on March 14, 2024, its announcement says. The 2026 report maintains 100/20 Mbps and abolishes, without replacement, the long-term goal of 1,000 Mbps down and 500 up set in 2024. Nationally, as of June 30, 2025, about 94 percent of Americans had 100/20 service available over wireline networks, 97 percent once fixed wireless is added and 99.7 percent with satellite. Those shares count people, not your street.

The map lists each building's providers at their advertised maximum

Each point on the map is a building, such as a home or an apartment building. Selecting it shows which providers report service there, by technology, with the maximum advertised download and upload speeds, the FCC's consumer guide to the map explains. Advertised maximums are not typical speeds.

"Available" has a defined meaning. Under 47 CFR 1.7004, a fixed provider reports the areas where it can provide service and is capable of a standard broadband installation, which 47 CFR 1.7001 defines as routine installation within 10 business days of the request, with no charges or delays for extending the network. The map also runs behind. Providers file by March 1 for data as of December 31 and by September 1 for data as of June 30, under the same section 1.7004, and the June 30, 2025, data first reached the map on November 25, 2025, according to the 2026 report.

Example: Summit and Chaffee counties sit 28.5 points apart

Example: two Colorado mountain counties, from Appendix A-5 of the FCC's 2026 Section 706 Report, with data as of June 30, 2025.

Scroll sideways to see the full table →

County, ColoradoPeople evaluated (FCC, June 2025)100/20 Mbps over wireline (FCC, June 2025)100/20 Mbps over wireline or fixed wireless (FCC, June 2025)Mobile 5G-NR at 35/3 Mbps (FCC, June 2025)
Summit County30,88295.5%98.1%94.7%
Chaffee County20,78067.0%77.4%91.9%

The wireline gap is 28.5 percentage points. In Chaffee County, 33.0 percent of people had no wireline 100/20 option, and 22.6 percent had none even counting fixed wireless; in Summit County, those shares were 4.5 and 1.9 percent. Mobile 5G coverage is close in both counties, but the same 2026 Section 706 Report finds that fixed and mobile broadband are not yet full substitutes. In a county like Chaffee, the address decides. Check it the way you check the flood zone: by the lot, not the town.

Many households have one wireline choice at 100/20

As of June 2025, about 46 percent of US households had no more than one provider offering 100/20 Mbps over wireline, the 2026 report estimates: 5.7 percent had none and 40.6 percent had one. Counting fixed wireless, 23 percent had one option or none. Choice thins outside cities. About 62 percent of urban households had at least two wireline options at 100/20, against about 23 percent of rural households. With one provider at the address, its label is the price.

The label shows typical speed and the monthly price

Under 47 CFR 8.1, a provider must display a broadband consumer label for each stand-alone plan at every point of sale, which includes its website, its stores and phone sales, and in customers' online account portals. Providers with more than 100,000 subscriber lines had to comply by April 10, 2024, and smaller ones by October 10, 2024. The FCC's label page says the labels disclose prices, introductory rates, data allowances and speeds.

Start with speed and price. The FCC's July 2026 order names the fields to read first, in the list it sets for phone sales: monthly price with monthly fees, the introductory rate and how long it lasts, typical download and upload speeds, latency, data allowance, contract term and early termination fee (Federal Register, August 13, 2026). The same order lets providers show a link or an icon at the point of sale instead of the full label, but that change to section 8.1(a) is delayed indefinitely, until the FCC publishes an effective date. Hold the typical speeds against 100/20, not the map's maximum.

Ask for service in writing; the reply is your evidence

Email each provider the map lists, ask for service at the address with an installation date, and keep the reply. The FCC's map guide lists grounds for an availability challenge, among them a denied request, excessive connection fees and no installation scheduled within 10 business days. Under 47 CFR 1.7006, a consumer's challenge must show the date, method and content of the request and the provider's response, and the challenger must reside or do business at the location or be authorized to request service there. The provider then has 60 days to reply, and 30 days to correct its data if it accepts. The clock starts at the portal alert. If you will work from that address, it also matters for the state your payroll withholds for.

Scorecard

  1. Search the address on the FCC National Broadband Map; count providers listing 100/20 Mbps or more there.
  2. Read each plan's broadband label and hold its typical speeds, not the map's maximum, against 100/20.
  3. Email each listed provider for service at the address and an installation date within 10 business days.
  4. If a provider refuses, file an availability challenge; it then has 60 days to reply.

Also in Places

Sources

  1. 2026 Section 706 Report, FCC 26-55, GN Docket No. 25-223 (adopted August 13, 2026)
  2. FCC Increases Broadband Speed Benchmark (FCC news release, March 14, 2024)
  3. Broadband Data Collection Consumer Information (FCC)
  4. 47 CFR 1.7004: Scope, content, and frequency of Broadband Data Collection filings
  5. 47 CFR 1.7001: Scope and content of filed reports (definitions)
  6. 47 CFR 8.1: Transparency
  7. Broadband Consumer Labels (FCC)
  8. Empowering Broadband Consumers Through Transparency, final rule, 91 FR 52251 (August 13, 2026)
  9. 47 CFR 1.7006: Data verification

Opened while researching this guide. Figures and rules can change; check the source before you act.